SVC Wire

SVC News & Insights

Cashews For Ramadan 2027: When Middle East Buyers Need To Book, Ship And Clear
🌙 Middle East

🕐 7 min read  ·  ✍️ SVC International JSC

Short answer

Cashews for Ramadan 2027 need to be on the water by early January. Ramadan is expected to begin on 8 February 2027, two days after the Lunar New Year on 6 February, when Vietnamese factories and ports slow down. Working back from shelves stocked before Ramadan, Middle East buyers should confirm orders in November and ship in December.

8 Feb 2027
Ramadan expected
UAE Astronomy Centre
6 Feb 2027
Lunar New Year
Vietnam slows before and after
Nov
Confirm orders
For December shipment
Early Jan
Last safe shipment
For most Gulf ports

When is Ramadan 2027, and why does Tet matter?

Cartons of cashew kernels loaded into a container for export to the Middle East
Loading for Middle East buyers

Ramadan 2027 is expected to begin on 8 February 2027, with Eid al-Fitr around 9 or 10 March, according to calculations by the UAE’s Astronomy Centre. The final dates depend on the moon sighting.

In Vietnam, the Lunar New Year (Tet) falls on 6 February 2027. Factories, trucking and port services slow in the weeks around Tet, and many workers take an extended holiday. In practice, this means the last weeks of January are the most congested shipping window of the year, and almost nothing moves in the week of Tet itself.

Ramadan and Tet fall in the same week in 2027. Buyers who usually ship in mid-January for Ramadan should plan to ship two to three weeks earlier this season.

What does the order timeline look like?

Work backwards from the date the goods must be in your warehouse. The timings below are planning assumptions; confirm transit with your forwarder for your port.

Planning timeline for Ramadan 2027 cashew orders
StepTargetNotes
Confirm grade, quantity and priceBy late NovemberLocks the production slot before the year-end rush
Approve samples and labelsLate NovemberRetail packs need artwork approval first
Production and packingEarly to mid DecemberVacuum-packed in 22.68 kg cartons or retail packs
Container loadingMid to late DecemberBook space early; December is busy
Transit to Gulf portsAbout 3 weeksCheck current schedules with your forwarder
Customs clearance and distributionMid to late JanuaryShelves stocked before 8 February

Shipping routes and peak-season congestion are covered in shipping cashews from Vietnam. A full 20ft container holds 700 cartons of 22.68 kg; see cashew 20ft container capacity.

Which cashews sell during Ramadan?

Tins and cartons of whole cashew kernels packed for export
Whole kernels and roasted grades for the season
  • Large white wholes (WW180, WW240) — for gifting, nut trays and premium retail.
  • WW320 — the volume grade for retail packs and wholesale.
  • Roasted and salted kernels (A180, A240, A320) — whole kernels roasted and salted with the skin on, popular for iftar and gatherings.
  • Pieces — for sweets, baking and cooking during the month.

Middle East buyers’ usual questions on grades, packing and certificates are answered in 5 questions Middle East buyers ask.

What are prices doing now?

SVC’s price update of 19 October 2026, FOB Ho Chi Minh City for November shipment, in AFI quality and 22.68 kg cartons:

SVC FOB prices, 19 October 2026 (US$/kg, November shipment)
GradeUS$/kg
WW1809.85
WW2408.05
WW3207.15
A1809.05
A2407.95
A3207.40

Market reports show Vietnamese offers firming into the fourth quarter, with raw nut costs high and exporters reluctant to discount; Commodity Board reported Vietnamese whole-kernel prices edging up week on week in early October. December shipment prices are quoted on request; the latest figures are on today’s cashew price.

What documents do Middle East buyers need?

Most Gulf importers ask for a Halal certificate, a certificate of origin, a certificate of analysis and the commercial documents. SVC’s factory is Halal-certified; what UAE buyers need for registration and import is set out in cashew supplier for the UAE. Retail packs also need labels in the destination’s required language, which should be approved before production.

What if you have missed the window?

If you confirm in December, you may still make it with bulk cartons, a port with a short transit and a fast clearance — but there is no margin. Retail packs with new artwork are unlikely to make it. In that case, it is usually better to plan the order for the post-Eid restocking period than to pay air freight or accept a late arrival.

How should you split a Ramadan order?

Many Gulf importers split the season into two shipments. The first, loaded in December, covers Ramadan itself; the second, loaded after Tet, refills stock for Eid al-Fitr and the weeks after. Splitting reduces the price risk of one large purchase and keeps warehouse stock fresher.

A two-shipment plan for Ramadan 2027
ShipmentLoadCovers
1Mid to late DecemberRamadan, from the expected start on 8 February
2After Tet, mid to late FebruaryEid al-Fitr, expected around 9–10 March, and restocking

Bulk cartons are the safest choice for the first shipment, because they need no new artwork. If you plan retail packs, start the artwork now and use the second shipment for them if time runs short.

Can retail packs still make it for Ramadan?

Only if the artwork is already approved. New packs need a printed proof and a sample before production, which usually takes longer than the window allows.

What if Ramadan starts a day earlier or later?

A day either way does not change the plan. What matters is having stock in your warehouse before the end of January.

📝 SVC Note

Tell us your port, the grades and the date the goods must be in your warehouse, and we will work back to the latest safe loading date.

Planning your Ramadan 2027 order? Request a quotation →